Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR17-00694
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2770 S VISTA AVE
Project NameICCU - VISTA
Customer Number 
ePlanReviewYes
Description
[ICCU - Vista]
The fire sprinkler scope of work consists of installing approximately 70' of 6" C-900 to a 6" stainless steel IBR. The 2 level building will have a 4" Ames C200 backflow. Threaded Sch. 40 pipe on the branch lines and Sch. 10 grooved pipe for the 3" mains. The systems are designed as a tree with floor control valves. The building structure is steel with metal joist.

• The underground piping is under permit FIR17-00605
[BLD17-01025]
Permit for the construction of a new 12,823 sq. ft. building with work to include general site work and the construction of the new building. The existing 6,400 sq. ft building is being demolished. This building is fully fire sprinklered and alarmed. CDM

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/14/20188/15/20188/15/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Jordan Fuger is the contact for this Final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection8/13/20188/14/20188/14/2018AFAIL
DetailsTroy Cobbley
Could not test the interconnect with the fire alarm system. Forward flush passed.


Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection8/10/20188/13/20188/13/2018AFAIL
DetailsTroy Cobbley
The project related fire alarm inspection was not ready, need canopies on 401's, need pressure relief valves installed, need verification for painted concealed canopies, need to pass the forward flush.....inspection stopped.


Jordan Fuger is the contact for this final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection8/3/20188/7/20188/7/2018ACANC
DetailsJim Page
Fire alarms are not ready per conversation with point of contact, inspection request will be rescheduled to coincide with fire alarm inspection, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/26/20187/26/20187/26/2018PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete, approved for cover.
INSP-Sprinkler Rough-in/Hydro7/26/20187/26/20187/26/2018PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauges.

Richard Clark is the contact for this overhead hydro inspection. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush5/22/20185/24/20185/24/2018PDONE
DetailsJim Page
Undergorund main line flush complete.

Jordan Fuger is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/17/20185/18/20185/18/2018PPART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping complete, rough in inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover. Notated city approved drawings where sway brace corrections are required.

The phone number provided is for Tom with CM Company. Our foreman on site is Troy, but he does not have a cell phone at the moment. Our office number is ###-#### if you have questions.
Thank you! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/8/20183/9/20183/9/2018ACANC
DetailsJim Page
Jordan is the contact for this hydro. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Supply line flush3/8/20183/9/20183/9/2018PCANC
DetailsTroy Cobbley
Jordan is the contact for this flush. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
Issue and Print Permit  12/7/2017 DONE
Sprinkler Plan Check12/6/2017 12/6/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  12/6/2017 DONE
DetailsTim Frost
Permit Ready to Issue  12/6/2017 DONE
Miscellaneous action  12/4/2017 PEND
Asked fire marshal if protection should be required below raised floor per NFPA requirements.
Sprinkler Plan Check11/30/2017 11/30/2017 FAIL
DetailsTim Frost
1st review completed  11/30/2017 FAIL
DetailsTim Frost
Miscellaneous action  11/30/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  11/29/2017 PASS
Plan assigned to (Tim)11/29/2017 11/29/2017 DONE
DetailsTim Frost
Application received  11/28/2017 DONE
Application submitted via PDS Online on Nov 28 2017 3:45PM