INSP-Final Inspection | 7/27/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Final Inspection | 7/26/2018 | 7/27/2018 | 7/27/2018 | P | CANC |
Troy Cobbley
|
|
|
No water on system so fire alarm contractor could not pre-test or test with me.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Final Inspection | 7/18/2018 | 7/19/2018 | 7/19/2018 | P | FAIL |
Jim Page
|
|
|
Three fire sprinklers are to close to the ceiling fans, at least 36 inches is required. Five of the dry sidewalls on level 1 are to close to the deck, sidewall heads need to be 4 to 6 inches down from the ceiling.
If at possible we would like to have this Thursday afternoon. Thank you! Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2018 | 5/25/2018 | 5/25/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauges for levels 1 and 2.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, approved for cover.
|
INSP-Sprinkler Rough-in | 3/5/2018 | 3/5/2018 | 3/5/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting on level 2 complete, level 2 approved for cover.
|
INSP-Sprinkler Rough-in | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for the second floor. I noted that the piping and pendant heads had not been installed where shown on the plans. This caused heads to be overspaced off walls, blocked by walls and located too close to each other in many locations. I also noted that the insulation needs to be "pocketed" around the piping to the dry sidewall heads in many locations and it also needs to be placed above the piping in several locations. I also noted a lack of coverage in the lobby area on the second floor and the first floor that Jim Danes is going to address. Also additional fittings have been added in to the gridded system that will need to be verified with hydraulic calculations to the plan reviewer.
2nd Floor Rough In Cover. Thank you! Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | FAIL |
Troy Cobbley
|
|
|
No city approved plans or notes on site. No inspection performed.
Can we please have a Rough In Cover on the 2nd Floor today please. Thank you! Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 2/15/2018 | 2/16/2018 | 2/16/2018 | P | FAIL |
Jim Page
|
|
|
Check head spacing throughout project to veirfy proper distance from walls. Hangers will need to be adjusted/added throughout project. FDC piping will need to be completed before FDC can be covered. Cover for overhead fire sprinkler piping is not approved.
|
INSP-Sprinkler Rough-in | 2/9/2018 | 2/12/2018 | 2/9/2018 | A | CANC |
Jim Page
|
|
|
1st Floor Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2017 | | DONE |
|
|
|
as per Tim F-ok to send to front desk
|
Permit Ready to Issue | | | 12/12/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/12/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/8/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/8/2017 | | 12/8/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 30 2017 1:47PM
|