INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection complete.
|
INSP-Final Inspection | 7/26/2019 | 7/29/2019 | 7/29/2019 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler head needs to be added corridor next to glass doors.
Cleve Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | FAIL |
Jim Page
|
|
|
Sprinklers need adjusted so the escutcheons fit tight against ceiling. Fire sprinkler heads need to be added in little entry to room behind kitchen with sliding glass doors as well as corridor next to glass doors.
Phone #: ###-#### Inspection requested via web by Todd Walter
|
FIR-Aging Inspection | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | FAIL |
Troy Cobbley
|
|
|
Rings have been provided around the pendant heads which need approval from the manufacture. Need warning signs at the riser as per the approved plans. Flow switch functioned and rang the outside alarm bell.
Todd Phone #: ###-####
|
INSP-Final Inspection | 11/2/2018 | 11/5/2018 | 11/5/2018 | A | CANC |
Troy Cobbley
|
|
|
Todd wants to reschedule for tomorrow when he has fittings to set off the flow switch.Todd Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/16/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Jim Page
|
|
|
Tenting inspection complete, overhead fire sprinkler piping approved for cover.
|
INSP-Sprinkler Rough-in | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | CANC |
Jim Page
|
|
|
Tenting inspection request scheduled for th wrong day, this reuqest is cancelled per conversation with installing contractor on job site.
|
INSP-Sprinkler Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping/pendant heads complete, areas where piping is between conditioned spaces approved for cover, areas where piping is in attic spaces and requires tenting not approved for cover. Tenting needs to be installed and inspected before cover is approved.
|
Permit Ready to Issue | | | 1/5/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/5/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/4/2018 | | 1/4/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2018 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 1/4/2018 | | DONE |
|
|
|
called comepany to get all the info so i can put them in our system as a fire protection company-he will call me back
|
Permit Ready to Issue | | | 1/4/2018 | | DONE |
|
|
|
MET-we need the Fire Protection Contractors Lic so we can put them in our system as fire sprinkler contractors-Tim Frost said they were licensed but they're not in our system
|
Plan assigned to (Tim) | 1/3/2018 | | 1/3/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/3/2018 | | 1/3/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/3/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 12/22/2017 | | 12/22/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/22/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/22/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 12/21/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/21/2017 | | 12/21/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/5/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 5 2017 9:06AM
|