INSP-Final Inspection | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Jessica Phone #: ###-####
|
INSP-Final Inspection | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PART |
Jim Page
|
|
|
Partial final inspection complete for fire sprinkler modifications in scope of work. Modifications have been made to the fire sprinkler system that was not done by Tribal Fire, demo work has also ben done by someone other than Tribal Fire.
|
Intake Approval | | | 12/6/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/6/2017 | | 12/6/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/6/2017 | | 12/6/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/6/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/6/2017 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 12/6/2017 | | DONE |
|
|
|
|
Application received | | | 12/5/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 5 2017 12:39PM
|