INSP-Final Inspection | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for core and shell complete.
Phone #: ###-#### Inspection requested via web by Nathan Price
|
Issue and Print Permit | | | 12/20/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/19/2017 | | DONE |
|
|
|
|
Alarm Plan Check | 12/19/2017 | | 12/19/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/19/2017 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 12/19/2017 | | DONE |
|
|
|
met
|
Miscellaneous action | | | 12/15/2017 | | DONE |
|
|
|
Revised drawings are inproperly rotated and cannot be stamped electronically. Directed Sean to have the orientation corrected to landscape and resubmit.
|
Plan assigned to (Lee) | 12/6/2017 | | 12/6/2017 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 12/6/2017 | | DONE |
|
|
|
Failed pre-screen review. I emailed Sean to inform him he needs engineer of record approval, remove single horn strobe from sprinkler room and provide fire pump monitoring.
|
Application received | | | 12/5/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 5 2017 2:04PM
|