Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR17-00710
StatusFinaled
Name APEX INTEGRATED SECURITY SOLUTIONS
Site Address 6675 S EISENMAN RD
Project NameGowen Industrial Park Bldg. B
Customer Number 
ePlanReviewYes
Description
This is a new building in which and Edwards iO64GD Fire Alarm Control Panel is being installed to monitor the sprinkler system as shown. This is an addressable system. The system is to be monitored by Apex Integrated Security, Inc. This work is associated with building permit BLD17-02765.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/13/20186/14/20186/14/2018APASS
DetailsJim Page
Final fire alarm inspection for core and shell complete.

Phone #: ###-#### Inspection requested via web by Nathan Price
Issue and Print Permit  12/20/2017 DONE
Plan resubmittals received  12/19/2017 DONE
Alarm Plan Check12/19/2017 12/19/2017 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  12/19/2017 DONE
Plans approved with review comments.
Permit Ready to Issue  12/19/2017 DONE
met
Miscellaneous action  12/15/2017 DONE
Revised drawings are inproperly rotated and cannot be stamped electronically. Directed Sean to have the orientation corrected to landscape and resubmit.
Plan assigned to (Lee)12/6/2017 12/6/2017 DONE
DetailsLee G Meredith
Miscellaneous action  12/6/2017 DONE
Failed pre-screen review. I emailed Sean to inform him he needs engineer of record approval, remove single horn strobe from sprinkler room and provide fire pump monitoring.
Application received  12/5/2017 DONE
Application submitted via PDS Online on Dec 5 2017 2:04PM