INSP-Final Inspection | 8/3/2018 | 8/6/2018 | 8/6/2018 | A | PASS |
Jim Page
|
|
|
Final inspection for scope of work complete.
Troy this is the hill crest jr. high and thew final test for the new Nitrogen dry system. Rick Fry of TVFP has spoken to Jim Page to be there @ 9:00 am Monday. Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Final Inspection | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, inspection will be rescheduled for a later date.
Rick Phone #: ###-####
|
INSP-Final Inspection | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | FAIL |
Troy Cobbley
|
|
|
I verifed the equipment but since the dry system exceeds 1,400 gallons I will need to trip test for time. Due to cold temperatures the contractor choose to waite for warmer weather. The new low air and water flow pressure switches will need to be verified at that time as well. Per Rick the system was tripped the previous day and functioned correctly.
Rick Phone #: ###-####
|
INSP-Final Inspection | 12/21/2017 | 12/26/2017 | 12/26/2017 | A | CANC |
Jim Page
|
|
|
Access could not be provided per conversation with Rick ###-####, this request is cancelled and will be rescheduled when access can be provided.
|
Intake Approval | | | 12/7/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/7/2017 | | 12/7/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/7/2017 | | 12/7/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/7/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/7/2017 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 12/7/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/7/2017 | | DONE |
|
|
|
|
Application received | | | 12/6/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 6 2017 3:46PM
|