INSP-Final Inspection | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
|
Issue and Print Permit | | | 2/28/2018 | | DONE |
|
|
|
|
INSP-Final Inspection | 2/23/2018 | 2/26/2018 | 2/26/2018 | P | CANC |
Troy Cobbley
|
|
|
Cancel per the gerneral contractor
Call prior to going Phone #: 2087246540 >> Inspection requested via mobile web by Tucker Scotton
|
Miscellaneous action | | | 2/26/2018 | | DONE |
|
|
|
Received product data for Pentair heat trace.
|
Plan Modification Accepted | | | 2/26/2018 | | DONE |
|
|
|
Sprinkler heat tape system added to underground water main.
|
Alarm Plan Check | 2/26/2018 | | 2/26/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/26/2018 | | DONE |
|
|
|
Plan mod approved.
|
Permit Ready to Issue | | | 2/26/2018 | | DONE |
|
|
|
DO NO RE ISSUE PLAN MOD
|
(F) Reprint permit | | | 2/26/2018 | | DONE |
|
|
|
|
Miscellaneous action | | | 2/23/2018 | | DONE |
|
|
|
Kenny requested workflow be opened to upload changes.
|
Issue and Print Permit | | | 12/12/2017 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 12/11/2017 | | 12/11/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 12/11/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 12/11/2017 | | 12/11/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2017 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 12/11/2017 | | DONE |
|
|
|
Met
|
Application received | | | 12/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 8 2017 2:23PM
|