INSP-Final Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in/Hydro | 3/7/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete.
|
INSP-Sprinkler Rough-in/Hydro | 12/26/2017 | 12/26/2017 | 12/26/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for area of work, approved for cover.
|
Sprinkler Plan Check | 12/18/2017 | | 12/18/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/18/2017 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 12/18/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/15/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/15/2017 | | 12/15/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/15/2017 | | 12/15/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/15/2017 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 12/14/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 14 2017 1:29PM
|