Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR17-00764
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3501 W ELDER ST Unit: 102
Project NameSMART SURGICAL PHASE 3
Customer Number 
ePlanReviewYes
Description
[Smart Surgical Phase 3] - Quick Permit
INSTALL 10 NEW HEADS AND ADJUST 17 EXISTING HEADS TO ADEQUATELY COVER A NEW TI IN THE OWYHEE PLAZA.

[BLD17-01935]
Note: Do Not Final until BLD17-01315 is finaled. Permit is to remodel an existing 15,507 sq. ft. business space within the west half on the first floor of the building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, new construction of interior non-bearing walls to create a lab area/clean room, a wash room, an autoclave room, a gowning room and an ante room, wall infill at the existing conference room and room #106, select new millwork, relocate fixtures, electrical work, mechanical work, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Modification Accepted  1/18/2018 DONE
Sprinkler Plan Check1/18/2018 1/18/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  1/18/2018 DONE
CHANGE STATUS TO (ISS)  1/18/2018 DONE
No charge for plan mod per Tim Frost
Permit Ready to Issue  1/18/2018 DONE
CHANGE STATUS TO (ISS)  1/18/2018 DONE
INSP-Final Inspection1/17/20181/17/20181/17/2018PPASS
DetailsTroy Cobbley
Permit finaled

Mike Martin is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in1/17/20181/17/20181/17/2018PPASS
DetailsTroy Cobbley
Rough-in passed.
Issue and Print Permit  12/27/2017 DONE
Intake Approval  12/22/2017 PASS
Plan assigned to (Tim)12/22/2017 12/22/2017 DONE
DetailsTim Frost
Sprinkler Plan Check12/22/2017 12/22/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  12/22/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  12/22/2017 DONE
DetailsTim Frost
Permit Ready to Issue  12/22/2017 DONE
Met
Application received  12/21/2017 DONE
Application submitted via PDS Online on Dec 21 2017 6:05PM