INSP-Final Inspection | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
Plan Modification Accepted | | | 1/16/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/16/2018 | | 1/16/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/16/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/16/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/16/2018 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PART |
Troy Cobbley
|
|
|
Rough-in is ok but plans need to be resubmitted showing the change out of all the existing pendant heads to new pendant heads.
|
Intake Approval | | | 12/29/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/29/2017 | | 12/29/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/29/2017 | | 12/29/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/29/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/29/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Issue and Print Permit | | | 12/29/2017 | | DONE |
|
|
|
|
Application received | | | 12/28/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 28 2017 7:41AM
|