INSP-Final Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler monitoring has been interfaced with the newly installed fire alarm system, this permit is finaled.
|
INSP-Final Inspection | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | CANC |
Jim Page
|
|
|
Wrong permit request generated, this inspection request is cancelled.
|
INSP-Final Inspection | 1/11/2018 | 1/12/2018 | 1/12/2018 | A | PART |
Troy Cobbley
|
|
|
Only item tested was, per Colton and the scope of work, is the main flow switch. The flow switch I tested was located at the main riser in the basement. I noticed that all of the tamper switches on this riser in the basement had been lock/chained open. I can't final until all devices have been connected/tested.
temp- Colton Phone #: ###-####
|
Application received | | | 1/11/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 11 2018 7:20AM
|
Plan assigned to (Lee) | 1/11/2018 | | 1/11/2018 | | DONE |
Lee G Meredith
|
|
|
|
Meeting | | | 1/11/2018 | | DONE |
|
|
|
Ron Johnson informed me that this is a temporary configuration that ties the new waterflow switch into an existing system that is in the near process of being replaced. The added waterflow switch is required to notify a monitoring station of an alarm.condition. A complete system replacement is in the design phase and will be submitted in the immediate future.
|
Plan assigned to (Lee) | 1/11/2018 | | 1/11/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/11/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 1/11/2018 | | 1/11/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/11/2018 | | DONE |
|
|
|
Plans approved as noted. No review comments.
|
Permit Ready to Issue | | | 1/11/2018 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 1/11/2018 | | DONE |
|
|
|
|