INSP-Final Inspection | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Jim Page
|
|
|
Final inspection for area of work complete.
|
INSP-Supply line flush | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | DONE |
Jim Page
|
|
|
Underground supply flush complete.
|
INSP-Sprinkler Rough-in | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining underground complete, approved for cover.
|
INSP-Sprinkler Rough-in | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete, IBR , change of direction with thrust block and approximately 20 feet of pipe approved for cover. Remaining pipe to be installed at a later date.
|
Intake Approval | | | 1/22/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/22/2018 | | 1/22/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/22/2018 | | 1/22/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/22/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/22/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/22/2018 | | DONE |
|
|
|
|
Application received | | | 1/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 18 2018 4:18PM
|