INSP-Final Inspection | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Final Inspection | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler head was not installed in washer/dryer closet, fire sprinkler head must be installed.
|
Intake Approval | | | 1/22/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/22/2018 | | 1/22/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/22/2018 | | 1/22/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/22/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/22/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Issue and Print Permit | | | 1/22/2018 | | DONE |
|
|
|
|
Application received | | | 1/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 19 2018 12:17PM
|