Permit Information
Permit NumberFIR18-00068
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 1150 W MYRTLE ST
Project NamePanera Bread #6066
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Panera Bread #6066 - UDG Only]
New 4"x125' C-900 underground with necessary thrust blocks and fittings.

[BLD17-0614]
Permit for the construction of a new 4,700 sq. ft. cafe with work to include general site work and construction of a new type VB building with an associated drive thru per the approved plans. his building is fully fire sprinklered for A2 occupancy over 100. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/12/20187/12/20187/12/2018PPASS
DetailsJim Page
Final inspection for undergorund supply complete.
INSP-Sprinkler Rough-in/Hydro7/11/20187/12/20187/12/2018ADONE
DetailsJim Page
Hydrostatic test for underground supply witnessed, no pressure loss observed at riser provided gauge.

underground hydro Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Supply line flush7/11/20187/12/20187/12/2018ADONE
DetailsJim Page
Undergorund main line flush complete.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Supply line flush6/27/20186/28/20186/28/2018ADONE
DetailsJim Page
Underground supply flush complete.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in4/12/20184/12/20184/12/2018APASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.
INSP-Final Inspection4/11/20184/12/20184/12/2018ACANC
DetailsJim Page
Inspection request is for a rough in, not a final inspection, this request is cancelled.
CHANGE STATUS TO (ISS)  4/12/2018 DONE
Per Jim Page change to issued status, didnt mean to final permit
INSP-Sprinkler Rough-in3/7/20183/7/20183/7/2018PPART
DetailsJim Page
Partial rough to cover inspection for underground supply complete, IBR and small section past footing approved for cover, remaining underground to be installed at a later date.
Sprinkler Plan Check2/23/2018 2/23/2018 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  2/23/2018 DONE
DetailsTim Frost
Permit Ready to Issue  2/23/2018 DONE
DetailsChristina Prado
All met
Issue and Print Permit  2/23/2018 DONE
Intake Approval  1/30/2018 PASS
Plan assigned to (Tim)1/30/2018 1/30/2018 DONE
DetailsTim Frost
Application received  1/29/2018 DONE
Application submitted via PDS Online on Jan 29 2018 1:58PM