Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR18-00070
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 1750 W STATE ST
Project NameCloud 9 TI
Customer Number 
ePlanReviewYes
Description
[Cloud 9 TI]
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

[BLD17-02121]
This building has a fire sprinkler system. To expand an existing 1,290 square foot tenant space into an adjacent 1,290 square foot space. After the expansion, this tenant space will have a total floor area of about 2,580 square feet. Portions of an interior nonbearing common wall located between the two spaces will be removed. Work is to include interior nonbearing walls, a toilet room accessible to the disabled, two Type I grease hood and duct systems, a Type II dishwasher hood and duct system, suspended acoustical ceilings, gypsum board ceiling, kitchen equipment, and finishes. Early start permit BLD17-02961 was prepared to allow interior nonstructural work to be started but not covered. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/8/20183/8/20183/8/2018PPASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.
INSP-Sprinkler Rough-in3/5/20183/6/20183/6/2018APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Issue and Print Permit  2/5/2018 DONE
Sprinkler Plan Check2/2/2018 2/2/2018 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  2/2/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  2/2/2018 DONE
DetailsTim Frost
Permit Ready to Issue  2/2/2018 DONE
Intake Approval  1/31/2018 PASS
Plan assigned to (Tim)1/31/2018 1/31/2018 DONE
DetailsTim Frost
Application received  1/29/2018 DONE
Application submitted via PDS Online on Jan 29 2018 5:55PM