INSP-Final Inspection | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Plan resubmittals received | | | 2/9/2018 | | DONE |
|
|
|
|
Alarm Plan Check | 2/9/2018 | | 2/9/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/9/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 2/9/2018 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 2/9/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 2/2/2018 | | 2/2/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 2/2/2018 | | FAIL |
|
|
|
Returned to Sean. Missing engineer of record review and shop drawing design does not match engineered drawings. This submittal appears to be partially confused with the breakroom addition that is currently under BLD review.
|
Application received | | | 2/1/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 1 2018 2:31PM
|