INSP-Final Inspection | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining overhead fire sprinkler piping in south open office area complete, complete area of work approved for cover.
Jordan Phone #: ###-####
|
Override - Parcel Holds | 5/18/2018 | 1/1/1900 | 5/18/2018 | | |
|
|
|
FIR rough in
|
INSP-Sprinkler Rough-in | 5/16/2018 | 5/17/2018 | 5/17/2018 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for area of work, area not approved for cover is the south open office area, heads are overspaced (4 heads total), rest of scope of work is approved for cover.
Jordan Fuger is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
Issue and Print Permit | | | 5/9/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/9/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 5/4/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/4/2018 | | 5/4/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/4/2018 | | 5/4/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/4/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
Sprinkler Plan Check | 4/30/2018 | | 4/30/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 4/30/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 2/6/2018 | | 2/6/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/6/2018 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 2/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/5/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/5/2018 | | 2/5/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/5/2018 | | 2/5/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 2/5/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 2/5/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 2/2/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 2 2018 1:42PM
|