INSP-Final Inspection | 6/11/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 5/4/2018 | 5/7/2018 | 5/7/2018 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler protection in the coolers and freezers is complete. Project appears ready for a final.
Roy Nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Troy Cobbley
|
|
|
Corrections have been made. All piping can be covered.
Terry Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed and piping can be covered. I noted two areas that need modifications though. The first is in the southeast kitchen a pendant head needs to be added and in the freezer area one pendant needs relocated.
RIck Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 3/16/2018 | 3/19/2018 | 3/19/2018 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/16/2018 | 3/19/2018 | 3/19/2018 | A | PASS |
Troy Cobbley
|
|
|
The piping above the hardlids is ok to cover except the three Kitchen areas which are not complete yet.
|
INSP-Sprinkler Rough-in | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | CANC |
Troy Cobbley
|
|
|
Tom Phone #: ###-####
|
Intake Approval | | | 2/6/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/6/2018 | | 2/6/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/6/2018 | | 2/6/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/6/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/6/2018 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 2/6/2018 | | DONE |
|
|
|
|
Application received | | | 2/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 5 2018 12:29PM
|