Permit Information
Permit NumberFIR18-00098
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 7576 W VICTORY RD
Project NameCOLLINS ENGINEERS T.I.
Customer Number 
ePlanReviewYes
Description
[Collins Engineers TI] - Quick Permit
Add, plug and relocate sprinklers to accommodate new wall and ceiling configuration.

[BLD17-04103]
The fire sprinkler system is used for building area increase and for fire area. Permit is to create a 2,800 sq. ft. office/warehouse tenant space within the 21,885 sq. ft. building. The building shell was constructed under permit BLD17-00763. Approval is contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create a demising wall, conference room, a storage room, an open office area, a warehouse area and (2) accessible restrooms, new door/doorframes, select new interior window, millwork, select new suspended acoustic and gypsum ceilings, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/26/20183/27/20183/27/2018APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.
INSP-Sprinkler Rough-in3/22/20183/23/20183/23/2018APASS
DetailsTroy Cobbley
Rough-in passed. Piping can be covered.


Adam Phone #: ###-####
Miscellaneous action  3/22/2018 DONE
as per Chad S-change address from 7552 W Victory #110
address was changed
INSP-Sprinkler Rough-in/Hydro2/14/20182/15/20182/15/2018APASS
DetailsTroy Cobbley
Rough-in passed for the piping above the hardlids. Drops to the T-bar ceilings have not been cut/installed yet.

Kerry Phone #: ###-####
Issue and Print Permit  2/7/2018 DONE
Application received  2/6/2018 DONE
Application submitted via PDS Online on Feb 6 2018 1:08PM
Intake Approval  2/6/2018 PASS
Plan assigned to (Tim)2/6/2018 2/6/2018 DONE
DetailsTim Frost
Sprinkler Plan Check2/6/2018 2/6/2018 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  2/6/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  2/6/2018 DONE
DetailsTim Frost
Permit Ready to Issue  2/6/2018 DONE