INSP-Final Inspection | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Miscellaneous action | | | 3/12/2018 | | DONE |
|
|
|
As built drawings received showing minoor changes to approved drawings. Plan modification submittal is not required.
|
INSP-Final Inspection | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | FAIL |
Troy Cobbley
|
|
|
I went ahead and tested all the fire alarm devices per the scope of work and they tested/reported fine. For a final sign off I need plan mod showing the change of addresses and the AES dialer instead of the phone lines that are shown on the city approved plans. Mike L Phone #: ###-####
|
Plan assigned to (Lee) | 2/21/2018 | | 2/21/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 2/21/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 2/21/2018 | | 2/21/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/21/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 2/21/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/21/2018 | | DONE |
|
|
|
|
Application received | | | 2/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 20 2018 12:33PM
|