Permit Information
Permit NumberFIR18-00140
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 7500 W MOSSY CUP ST
Project NameNxEdgeTI Phase 5
Customer Number 
ePlanReviewYes
Description
[NxEdge TI Phase 5]
The fire sprinkler scope of work consists of installing new branch lines and pendents in a expanded/renovated space, in this existing building, with an existing fire sprinkler system.

There does not seem to be an associated building permit at this time.

[BLD16-NA]

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/26/20183/26/20183/26/2018PPASS
DetailsTroy Cobbley
permit finaled

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro3/1/20183/2/20183/2/2018APASS
DetailsTroy Cobbley
Overhead rough-in passed. Overhead hydro test passed. Piping can be covered


Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro3/1/20183/1/20183/1/2018PPART
DetailsTroy Cobbley
Of the two systems the north side passed the overhead hydro. The south side system failed due to visable loss at the guage.


Please call Anthony before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Issue and Print Permit  2/26/2018 DONE
Sprinkler Plan Check2/23/2018 2/23/2018 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  2/23/2018 DONE
DetailsTim Frost
Permit Ready to Issue  2/23/2018 DONE
Met
Intake Approval  2/22/2018 PASS
Plan assigned to (Tim)2/22/2018 2/22/2018 DONE
DetailsTim Frost
Sprinkler Plan Check2/22/2018 2/22/2018 FAIL
DetailsTim Frost
1st review completed  2/22/2018 FAIL
DetailsTim Frost
Miscellaneous action  2/22/2018 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  2/20/2018 DONE
Application submitted via PDS Online on Feb 20 2018 5:45PM