INSP-Final Inspection | 3/28/2018 | 3/29/2018 | 3/29/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Final Inspection | 3/15/2018 | 3/16/2018 | 3/16/2018 | A | FAIL |
Jim Page
|
|
|
Tamper switchs and flow switch worked correctly, FDC identification plate needs installed on FDC connection, overhead doors need fire sprinkler protection installed underneath.
|
INSP-Final Inspection | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | CANC |
Jim Page
|
|
|
Please schedule for late AM (11ish) Roy Nelson Phone #: ###-#### >> Inspection requested via web by Nathan Stenquist Inspection cancelled from web by: Nathan Stenquist
|
Intake Approval | | | 2/22/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/22/2018 | | 2/22/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/22/2018 | | 2/22/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/22/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/22/2018 | | DONE |
Christina Prado
|
|
|
All met
|
Issue and Print Permit | | | 2/22/2018 | | DONE |
|
|
|
|
Application received | | | 2/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 21 2018 10:13AM
|