INSP-Final Inspection | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete.
John Phone #: ###-####
|
Issue and Print Permit | | | 3/12/2018 | | DONE |
|
|
|
|
Alarm Plan Check | 3/9/2018 | | 3/9/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/9/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 3/9/2018 | | DONE |
|
|
|
met
|
Miscellaneous action | | | 3/7/2018 | | DONE |
|
|
|
Received engineer approved files. Emailed John Lopez to request that he break apart the bound files and upload only new or changed files to eplanreview. Changed files are to have identical file names as originals. Workflow reopened for uploads. John made the above corrections and uploaded them.
|
Application received | | | 2/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 23 2018 10:11AM
|
Plan assigned to (Lee) | 2/23/2018 | | 2/23/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 2/23/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 2/23/2018 | | 2/23/2018 | | PASS |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 2/23/2018 | | DONE |
|
|
|
Emailed John Lopez to request an engineer of record approval letter.
|