INSP-Final Inspection | 6/12/2018 | 6/13/2018 | 6/13/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
Plan assigned to (Tim) | 6/8/2018 | | 6/11/2018 | | DONE |
Tim Frost
|
|
|
|
Plan Modification Accepted | | | 6/11/2018 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 6/11/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 6/11/2018 | | 6/11/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/11/2018 | | 6/11/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/11/2018 | | DONE |
|
|
|
Plan mod approved.
DO NOT REISSUE
|
CHANGE STATUS TO (ISS) | | | 6/11/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 6/8/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
INSP-Sprinkler Rough-in | 6/6/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping associated with the conveyor system complete.
|
INSP-Sprinkler Rough-in/Hydro | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping associated with the Conveyor System sprinklers witnessed, no pressure loss observed at riser provided gauges.
Mike Bierman is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PART |
Jim Page
|
|
|
Partial rough in inspection for sprinkler protection under conveyors complete.
Mike Bierman will be the contact for this partial Rough-in inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
Sprinkler Plan Check | 3/6/2018 | | 3/6/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/6/2018 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 3/6/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/1/2018 | | 3/1/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 3/1/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/1/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 2/28/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/28/2018 | | 2/28/2018 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 27 2018 1:27PM
|