Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR18-00156
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6610 S ELITE DR
Project NameFedEx Conveyors Fire Sprinkler
Customer Number 
ePlanReviewYes
Description
[FedEx Ground Based - Conveyor System]
The fire sprinkler scope of work consists of protecting below conveyors and platforms. There are five systems. The systems are connected to the overhead manifolds. The systems are divided the same as the overhead systems. A mixture of extended coverage and regular sprinklers are being utilized.

[BLD17-03777]
Special Inspection per form 310. Permit for the material handling conveyor system installation. Exiting system shall be evaluated once conveyor system is installed for travel distances, exit signs and emergency egress systems. This buiding is fully fire sprinklered. **

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/12/20186/13/20186/13/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Phone #: ###-#### Inspection requested via web by Stan Beus
Plan assigned to (Tim)6/8/2018 6/11/2018 DONE
DetailsTim Frost
Plan Modification Accepted  6/11/2018 DONE
DetailsTim Frost
Intake Approval  6/11/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)6/11/2018 6/11/2018 DONE
DetailsTim Frost
Sprinkler Plan Check6/11/2018 6/11/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/11/2018 DONE
DetailsTim Frost
Permit Ready to Issue  6/11/2018 DONE
Plan mod approved.
DO NOT REISSUE
CHANGE STATUS TO (ISS)  6/11/2018 DONE
Plan Modification Accepted  6/8/2018 DONE
DetailsAdele J Schaffeld-Griffin
INSP-Sprinkler Rough-in6/6/20186/6/20186/6/2018APASS
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping associated with the conveyor system complete.
INSP-Sprinkler Rough-in/Hydro6/5/20186/6/20186/6/2018ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping associated with the Conveyor System sprinklers witnessed, no pressure loss observed at riser provided gauges.

Mike Bierman is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro5/9/20185/10/20185/10/2018APART
DetailsJim Page
Partial rough in inspection for sprinkler protection under conveyors complete.

Mike Bierman will be the contact for this partial Rough-in inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
Sprinkler Plan Check3/6/2018 3/6/2018 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  3/6/2018 DONE
DetailsTim Frost
Permit Ready to Issue  3/6/2018 DONE
Met
Issue and Print Permit  3/6/2018 DONE
Sprinkler Plan Check3/1/2018 3/1/2018 FAIL
DetailsTim Frost
1st review completed  3/1/2018 FAIL
DetailsTim Frost
Miscellaneous action  3/1/2018 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  2/28/2018 PASS
Plan assigned to (Tim)2/28/2018 2/28/2018 DONE
DetailsTim Frost
Application received  2/27/2018 DONE
Application submitted via PDS Online on Feb 27 2018 1:27PM