INSP-Final Inspection | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspwection for scope of work complete.
Call ahead // Bill Phone #: ###-####
|
Plan assigned to (Lee) | 7/2/2019 | | 7/3/2019 | | DONE |
Lee G Meredith
|
|
|
as builds
|
1st review completed | | | 7/3/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 7/3/2019 | | 7/3/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/3/2019 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 7/3/2019 | | DONE |
|
|
|
as built per lee
|
CHANGE STATUS TO (ISS) | | | 7/3/2019 | | DONE |
|
|
|
plan mod/as built
|
Plan Modification Accepted | | | 7/2/2019 | | DONE |
|
|
|
As built for Alarmco started in e plan
|
Case Summary | | | 6/20/2018 | | DONE |
|
|
|
|
INSP-Final Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | FAIL |
Jim Page
|
|
|
AES communicator is not within 20 feet of the fire as noted on the city approved drawings. AES communicator is not on a dedicated circuit.
|
Issue and Print Permit | | | 4/26/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 3/7/2018 | | 3/7/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/7/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 3/7/2018 | | 3/7/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/7/2018 | | DONE |
|
|
|
Quick permit approved as noted. No review comments.
|
Permit Ready to Issue | | | 3/7/2018 | | DONE |
|
|
|
Met
|
Application received | | | 3/2/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 2 2018 12:28PM
|