INSP-Final Inspection | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
Contact Gary for time. Request at or after 8:30 am. Thanks! Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
INSP-Final Inspection | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | FAIL |
Troy Cobbley
|
|
|
City approved plans and data sheets were on site but no review comments. I noted alot of smoke detectors located too close to air grills, atleast on strobe is overspaced in the southwest corner of the second floor, the plans indicate two phone lines but one IP line has been installed instead. Plans need to be resubmitted showing the actual installation including battery backup, equipment used and wiring arrangements for the actual installation. No testing of devices have been performed due to the above issues.
Phone #: ###-#### Inspection requested via web by Gary Gambino
|
INSP-Final Inspection | 8/10/2018 | 8/13/2018 | 8/13/2018 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans/small documents/notes on site for inspection. No inspection was performed.
Contact Gary for time. Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
PLANS TAKEN FRONT DESK ALARM | | | 5/7/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 5/7/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/7/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/7/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/3/2018 | | DONE |
|
|
|
|
Miscellaneous action | | | 5/3/2018 | | DONE |
|
|
|
Emailed shane to let him know I still don't see an engineer of record review and approval. Shane responded 5-7-18 to indicate he had submitted this information but also attached it. I imported it into projectdox but it still did not show properly. Imported into Tidemark documents. Problem resolved.
|
1st review completed | | | 3/14/2018 | | DONE |
|
|
|
Returned for prescreen review failure. Missing engineer of record review.
|
Application received | | | 3/9/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 9 2018 2:26PM
|
Alarm Plan Check | 5/7/2018 | | | | PASS |
|
|
|
|