INSP-Final Inspection | 4/2/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Jim Page
|
|
|
Final AES inspection complete.
as late in pm as possible - can't have alarms go off during school // Will Phone #: ###-####
|
Fees Due Hold | 3/23/2019 | | 4/2/2019 | | DONE |
Brittany Hill
|
|
|
|
INSP-Final Inspection | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | FAIL |
Jim Page
|
|
|
Trouble restores with monitoring when a general fire alarm is sent even though fire panel is still in trouble.
Bill Phone #: ###-####
|
Fees Due Hold | 3/22/2019 | | 3/22/2019 | | DONE |
Judith Amador
|
|
|
|
INSP-Final Inspection | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | FAIL |
Jim Page
|
|
|
Valve on fire sprinkler system reports out as a trouible, when fire alarm panel is in trouble, each subsequent trouble does not report out until panel is reset.
Bill Phone #: ###-####
|
INSP-Final Inspection | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | FAIL |
Jim Page
|
|
|
AES did not show NETCON 5.
Jacob Phone #: ###-####
|
INSP-Final Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | FAIL |
Jim Page
|
|
|
Put panel into trouble, trouble signal was recieved at central station, sent a general alarm and trouble restored at central station. Issue needs to be resloved and panel needs to be tested with real events and not shorting contacts.
Jacob Phone #: ###-####
|
Miscellaneous action | | | 3/11/2019 | | DONE |
|
|
|
Workflow opened for as built upload
|
Miscellaneous action | | | 3/11/2019 | | DONE |
|
|
|
As built approved, subject to inspectors functional test and comparison of as builts to actual installation.
|
Case Summary | | | 6/20/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/26/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 3/21/2018 | | 3/21/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/21/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 3/21/2018 | | 3/21/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/21/2018 | | DONE |
|
|
|
Quick permit approved as noted. No review comments.
|
Permit Ready to Issue | | | 3/21/2018 | | DONE |
|
|
|
met
|
Application received | | | 3/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2018 7:52PM
|