INSP-Final Inspection | 4/26/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Brian Phone #: ###-####
|
Override - Parcel Holds | 4/26/2018 | 1/1/1900 | 4/26/2018 | | |
|
|
|
FIR final
|
INSP-Sprinkler Rough-in/Hydro | 4/17/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test on dry system passed
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | PASS |
Troy Cobbley
|
|
|
The overhead 200lb hydro on new dry system passed. The 24 hour air test was started at 1:40 with 44psi on the guage.
|
Intake Approval | | | 3/22/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/22/2018 | | 3/22/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/22/2018 | | 3/22/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/22/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/22/2018 | | DONE |
|
|
|
All Requirements Met
|
Issue and Print Permit | | | 3/22/2018 | | DONE |
|
|
|
|
Application received | | | 3/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 21 2018 12:00PM
|