Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR18-00257
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 10499 W FAIRVIEW AVE
Project Name17-136 Ace Hardware
Customer Number 
ePlanReviewYes
Description
[Ace Hardware 17-136] - Quick Permit
Vestibule and stairs only to be protected, see clouded areas.
[BLD17-03778]
**NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR PERMIT PRIOR TO OCCUPYING THE SPACE. Permit to remodel an existing 17,744 sq ft retail tenant space within the existing Belmont Plaza. The building was previously occupied by K-Mart and subdivided into smaller tenant spaces under shell/core permit BLD17-01449. Work to include demo of exterior masonry wall for new openings; infill of existing openings in exterior wall; demo of interior non-bearing partitions; new floor slab; new stair; new interior non-bearing walls; new plumbing, electrical, and mechanical work; and new interior finishes in compliance with Ch. 8 of the 2012 IBC. Special inspections required per Form 310. The fire sprinkler system is used for unlimited area of the building AND to allow 3-hr fire barrier walls in lieu of fire walls. The fire sprinkler system is NOT allowed to be used for building area increase for A Occupancies. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/30/20184/2/20184/2/2018APASS
DetailsTroy Cobbley
permit finaled


Contact Scott Powada ###-#### 30 min prior to Final insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
Sprinkler Plan Check3/30/2018 3/30/2018 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  3/30/2018 DONE
DetailsTim Frost
Permit Ready to Issue  3/30/2018 DONE
All Requirements Met
Issue and Print Permit  3/30/2018 DONE
Application received  3/28/2018 DONE
Application submitted via PDS Online on Mar 28 2018 8:49AM
Intake Approval  3/28/2018 PASS
Plan assigned to (Tim)3/28/2018 3/28/2018 DONE
DetailsTim Frost