INSP-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Jim Page
|
|
|
Notes for as builts are entered under the FIR permit, final inspection complete.
Submitted as built plans to Lee Meredith, plans were approved after Troy left for the day. Scheduled new Inspection per Troy for approval. If there are questions please call Chris @ ###-####697 Phone #: ###-#### Inspection requested via web by Chris Siewert
|
INSP-Final Inspection | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | FAIL |
Troy Cobbley
|
|
|
Project will be ok for final when plan review approves the as-builts
Chris Siewert - Techinician Phone #: ###-#### Inspection requested via web by John Siewert
|
Miscellaneous action | | | 8/8/2018 | | DONE |
|
|
|
John requested workflow to be opened to upload as built drawings to reflect a minor change required during inspection.
|
Miscellaneous action | | | 8/8/2018 | | DONE |
|
|
|
As built drawing and calcs uploaded to eplanreview by John. REviewed and approved.
|
Issue and Print Permit | | | 4/9/2018 | | DONE |
|
|
|
|
Application received | | | 4/2/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 2 2018 11:33AM
|
Plan assigned to (Lee) | 4/2/2018 | | 4/2/2018 | | PASS |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/2/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 4/2/2018 | | 4/2/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/2/2018 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 4/2/2018 | | DONE |
|
|
|
All Requirements Met
|