INSP-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Adam Phone #: ###-####
|
Plan Modification Accepted | | | 9/21/2018 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/21/2018 | | 9/21/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/21/2018 | | 9/21/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/21/2018 | | DONE |
|
|
|
PLAN MOD
|
CHANGE STATUS TO (ISS) | | | 9/21/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/21/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/19/2018 | | DONE |
|
|
|
plan mod-relocate heads
|
CHANGE STATUS TO (ISS) | | | 9/19/2018 | | DONE |
|
|
|
changed to REV by mistake
|
INSP-Sprinkler Rough-in | 9/13/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Jim Page
|
|
|
Adam Phone #: ###-#### >> Inspection requested via web by Nathan Stenquist
_______________
Ok but new drawings are required BEFORE final.
|
INSP-Sprinkler Rough-in | 9/13/2018 | 9/14/2018 | 9/13/2018 | P | CANC |
Jim Page
|
|
|
Adam Phone #: ###-#### Inspection cancelled from web by: Nathan Stenquist
|
Sprinkler Plan Check | 4/6/2018 | | 4/6/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2018 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 4/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/5/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/5/2018 | | 4/5/2018 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 4/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 4 2018 3:51PM
|