INSP-Final Inspection | 1/22/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
Tony Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for underground supply witnessed, no pressure loss observed.
|
INSP-Sprinkler Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground suplly complete, approved for cover.
Underground rough to cover Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/24/2018 | 5/25/2018 | 5/25/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for riser stub up and approximately 5 feet of underground piping from building footing complete, area installed and inspected approved for cover.
Bryan Collins is the contact for this underground rough-in. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
Issue and Print Permit | | | 5/15/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/19/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/19/2018 | | 4/19/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/19/2018 | | 4/19/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/19/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/19/2018 | | DONE |
|
|
|
Met
|
Application received | | | 4/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 17 2018 5:00PM
|