INSP-Final Inspection | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Previous items noted have been corrected.
Call James before you head up, he will have Nate meet you there. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | FAIL |
Jim Page
|
|
|
Escutcheon is stairway is painted. Install escutcheon in HVAC closet. Provide conditioned in garage to maintain 40 degrees or above to be code compliant.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Plan assigned to (Stumbaugh) | 2/4/2019 | | 2/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/5/2019 | | 2/5/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
No Fee
|
Permit Ready to Issue | | | 2/5/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 2/5/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/4/2019 | | DONE |
|
|
|
adding a double check backflow device. Eplan workflow started
|
INSP-Sprinkler Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Tim Frost
|
|
|
Check three places of tenting the previous inspector was concerned about. All three places appeared to be ok.
Called went to voice mail. Left message 3:29
Tenting Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PART |
Troy Cobbley
|
|
|
The sprinkler rough-in passed but the tenting failed. No piping to be covered until tenting is passed.
|
INSP-Sprinkler Rough-in | 11/5/2018 | 11/6/2018 | 11/6/2018 | P | CANC |
Troy Cobbley
|
|
|
Tenting inspection Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | CANC |
Troy Cobbley
|
|
|
Call Anthony before heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
Issue and Print Permit | | | 5/2/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/19/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/19/2018 | | 4/19/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/19/2018 | | 4/19/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/19/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/19/2018 | | DONE |
|
|
|
|
Application received | | | 4/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 18 2018 11:04AM
|