INSP-Final Inspection | 4/2/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection complete.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | FAIL |
Jim Page
|
|
|
4 heads to close to heat registers, a minimum of 24 inches is allowed per NFPA 13D. Head in master bathroom needs to be relocated to spray in shower area, walls of shower do not go all the way to the ceiling so shower is not a seperate compartment. Garage needs to be a conditioned spaces due to fire sprinkler install.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Plan assigned to (Stumbaugh) | 2/4/2019 | | 2/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/5/2019 | | 2/5/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
No Fee
|
Permit Ready to Issue | | | 2/5/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 2/5/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/4/2019 | | DONE |
|
|
|
Adding a double check backflow device. Eplan work flow started.
|
INSP-Sprinkler Rough-in | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Jim Page
|
|
|
All tenting in place at time of inspection, overhead fire sprinkler piping approved for cover.
Tenting inspection, call Anthony before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 10/11/2018 | 10/11/2018 | 10/11/2018 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, sprinkler piping requiring tenting not approved for cover, all other fire sprinkler piping approved for cover.
Please call Anthony before heading out, thank you. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Issue and Print Permit | | | 4/30/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/23/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/23/2018 | | 4/23/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/23/2018 | | 4/23/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/23/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/23/2018 | | DONE |
|
|
|
All Requirements Met
|
Application received | | | 4/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 20 2018 2:04PM
|