DOC - Permit Finaled | | | 11/20/2019 | | DONE |
|
|
|
Previous task shows acceptance test passed but hadn't been properly figned off.
|
INSP-Alarm Testing | 8/7/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Mark Scharfen
|
|
|
Verified Netcon, wiring, radio troulbe, restore, alarm, trouble and supervisory from facp. Passed test.
Please meet Alarmco staff on site. Phone #: ###-#### Inspection requested via web by Jeff Gooch
|
1st review completed | | | 8/6/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 8/6/2019 | | 8/6/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/6/2019 | | DONE |
|
|
|
As built - no fee.
|
Permit Ready to Issue | | | 8/6/2019 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 8/6/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 7/26/2019 | | DONE |
|
|
|
as built request by Lori
|
Plan assigned to (Lee) | 7/26/2019 | | 7/26/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
Case Summary | | | 6/20/2018 | | DONE |
|
|
|
|
Miscellaneous action | | | 5/2/2018 | | DONE |
|
|
|
Stephanie emailed a response indicating that thearrows were misplaced and the AES is to be located in room 136.
|
1st review completed | | | 5/2/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 5/2/2018 | | 5/2/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/2/2018 | | DONE |
|
|
|
Quick permit approved as noted on riser drawing. No review comments.
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
|
|
|
All Requirements met
|
Issue and Print Permit | | | 5/2/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 5/1/2018 | | 5/1/2018 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 5/1/2018 | | DONE |
|
|
|
Emailed Stephanie to find out if AES is located in the library or in the same room as the FACP.
|
Application received | | | 4/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 29 2018 2:44PM
|