Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR18-00381
StatusIssued
Name TRIBAL FIRE SYSTEMS
Site Address 2990 S WISE WAY
Project NameStock Construction underground
Customer Number 
ePlanReviewYes
Description
[Stock - UDG only] - Quick Permit
Tie into new city water main with new 6" C-900 piping. Connect to existing 6" main. Complete with fittings and thrust blocks. A portion of the existing main from an existing fire pump will be disconnected and capped. There is an upgrade aggreement in place for this project.

There does not seem to be an associated building permit at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  5/1/2019 DONE
INSP-Supply line flush6/15/20186/18/20186/18/2018PDONE
DetailsJim Page
Underground main supply flush complete.

Please call Chris Felty thank you Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in/Hydro6/13/20186/14/20186/14/2018APASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.

Underground rough in Please call James Mair.

Thank you Phone #: ###-#### Inspection requested via web by Jessia Maxwell
Intake Approval  6/13/2018 PASS
Plan assigned to (Tim)6/13/2018 6/13/2018 DONE
DetailsTim Frost
Sprinkler Plan Check6/13/2018 6/13/2018 PASS
DetailsTim Frost
1st review completed  6/13/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/13/2018 DONE
DetailsTim Frost
Permit Ready to Issue  6/13/2018 DONE
All requirement met
Issue and Print Permit  6/13/2018 DONE
Plan resubmittals received  6/6/2018 DONE
letter was brought in for Jason Blais-stamped it-attached it to docs and took to Jason B
Miscellaneous action  5/14/2018 DONE
Sent the following email.

Clarence,

This is what needs to happen before I can approve and changes to the fire protection including the underground.

• Stock Construction needs to submit an upgrade agreement to make the system compliant in one year. This would include achieving the correct density based on the commodity/hazard.
• The unsprinklered areas would have to be sprinklered immediately including the spray paint booth.
• An impairment plan needs to be submitted and approved for the underground modification. This would include a fire watch while the sprinkler system is was impaired.

Feel free to contact me with questions.
Application received  5/8/2018 DONE
Application submitted via PDS Online on May 8 2018 12:23PM
Agreement of Future work6/4/20186/4/2019   
DetailsAdele J Schaffeld-Griffin
(STOCK CONSTRUCTION) see upgrade agreement attached for fire sprinkler upgrade