INSP-Final Inspection | 1/11/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
POC is Zack Grasmick Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
INSP-Sprinkler Rough-in | 1/14/2019 | 1/14/2019 | 1/14/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Hydro Test for Overhead System. POC is Zack Grasmick Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2019 | 1/14/2019 | 1/11/2019 | P | CANC |
Jim Page
|
|
|
Hydro test to be performed same time as permit FIR18-00617. POC is Zack Grasmick Phone #: ###-#### >> Inspection requested via web by Brett Lawatch Inspection cancelled from web by: Brett Lawatch
|
INSP-Sprinkler Rough-in | 12/31/2018 | 1/2/2019 | 1/2/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids complete, hardlids approved for cover.
Zach Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/27/2018 | 12/28/2018 | 12/28/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in phase 3 kitchen area and soffit in expansion area complete, approved for cover.
Rough to cover, server area - Zach Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 12/4/2018 | 12/5/2018 | 12/5/2018 | P | PART |
Jim Page
|
|
|
Hydro was for shell piping, pendants and armovers still need to be installed after finish ceiling, a hydrostatic test will need to be completed after heads are cut in. Rough in inspection for overhead fire sprinkler piping complete, a cover inspection will be required after heads are cut in for cover approval.
Foreman on job is Zack Grasmick. Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
INSP-Sprinkler Rough-in | 10/12/2018 | 10/12/2018 | 10/12/2018 | A | CANC |
Jim Page
|
|
|
|
Plan resubmittals received | | | 6/15/2018 | | |
|
|
|
|
Sprinkler Plan Check | 6/15/2018 | | 6/15/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 6/15/2018 | | 6/15/2018 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/15/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/15/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/31/2018 | | 5/31/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/31/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 5/9/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/9/2018 | | 5/9/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/9/2018 | | 5/9/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/9/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/9/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 5/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 8 2018 1:19PM
|