Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR18-00402
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 1111 W JEFFERSON ST Unit: 60
Project NameBoise Plaza Basement Vanilla A
Customer Number 
ePlanReviewYes
Description
[Boise Plaza Basement Vanilla]
The fire sprinkler scope of work consists of plugging 11 SSP and relocate 32 SSP using 72" VICFLEX. Calculations provided for 46' equivalent length. Light Hazard office shell.
[BLD18-01455]
(Vanilla SUITE #60– LOWER FLOOR) (3 PERMITS FILED UNDER BLD18-01397 IN EPLANREVIEW) NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. This building is fire sprinklered because it is a high rise. Permit is to remodel an existing 3,530 sq. ft. vacant tenant space on the lower plaza level that was created under BLD18-00825 with the creation of the new corridor to the elevator lobby. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select millwork, removal of select plumbing fixture, select new interior corridor storefront windows, select new suspended acoustic ceiling, select new light fixtures, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/19/201810/22/201810/22/2018APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in9/28/201810/1/201810/1/2018APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
Intake Approval  5/15/2018 PASS
Plan assigned to (Tim)5/15/2018 5/15/2018 DONE
DetailsTim Frost
Sprinkler Plan Check5/15/2018 5/15/2018 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  5/15/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  5/15/2018 DONE
DetailsTim Frost
Permit Ready to Issue  5/15/2018 DONE
met
Issue and Print Permit  5/15/2018 DONE
(F) Reprint permit  5/15/2018 DONE
Application received  5/14/2018 DONE
Application submitted via PDS Online on May 14 2018 9:19AM