INSP-Final Inspection | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete for area of work.
Please give Mike a call prior to heading out. Would like to do it at 7:00 am. Phone #: ###-#### Inspection requested via web by Sam Ball
|
Miscellaneous action | | | 5/24/2018 | | DONE |
|
|
|
Emailed Mary to indicate that the detectors proposed do not match the existing. She will check with Sam to see if he can change for a reasonable price.
|
Miscellaneous action | | | 5/24/2018 | | DONE |
|
|
|
After further research, Sam found that the fire smoke dampers already had detection installed. New drawing was provided that deletes the addition of fire smoke dampers and detection.
|
Plan assigned to (Lee) | 5/24/2018 | | 5/24/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/24/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 5/24/2018 | | 5/24/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/24/2018 | | DONE |
|
|
|
Quick permit approved. No review comments.
|
Permit Ready to Issue | | | 5/24/2018 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 5/24/2018 | | DONE |
|
|
|
|
Application received | | | 5/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 23 2018 2:22PM
|