Permit Information
Permit NumberFIR18-00426
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 1757 N HAMPTON RD
Project NameComplete Restoration TI
Customer Number 
ePlanReviewYes
Description
[Complete Restoration Services TI] - Quick Permit
Office remodel with new drop ceilings at 1st floor. Relocate sprinklers for new wall layout and add sprinklers above 1st floor ceiling.

[BLD18-00567]
Permit for tenant improvements to an existing 16,200 sq. ft. building with work to include removal of interior nonbearing partition walls and the construction of new interior nonbearing partition walls to create new office and breakroom areas on the first story and office and storage areas on the second story. The North portion of the space will consist of a drying room, cleaning areas and space for 4 washers and dryers. Minor electrical, plumbing and mechanical work will also be completed. This building is fully fire sprinklered for a story increase and allowable area. Any alteration to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/25/20187/27/20187/27/2018PPASS
DetailsTroy Cobbley
Permit finaled

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in7/9/20187/10/20187/10/2018APASS
DetailsTroy Cobbley
Rough-in passed. Piping can be covered.

Phone #: ###-#### Inspection requested via web by Sam Ball
Intake Approval  6/1/2018 PASS
Plan assigned to (Tim)6/1/2018 6/1/2018 DONE
DetailsTim Frost
Sprinkler Plan Check6/1/2018 6/1/2018 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  6/1/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/1/2018 DONE
DetailsTim Frost
Permit Ready to Issue  6/1/2018 DONE
met
Issue and Print Permit  6/1/2018 DONE
Application received  5/25/2018 DONE
Application submitted via PDS Online on May 25 2018 9:31AM