INSP-Final Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work complete.
rick Phone #: ###-####
|
Issue and Print Permit | | | 10/5/2018 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | CANC |
Jim Page
|
|
|
Inspection request is for a rough in inspection, this request is cancelled and the correct inspection request will be generated.
Tom Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PART |
Tim Frost
|
|
|
TOM SMALL IS OUR SITE CONTACT. PER CONVERSATION WITH TIM FROST THE PLAN EXAMINER HE WILL PERFORM INSPECTION TOMORROW MORNING AT 7:00AM Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt
_____________________
Partial passed, see red line drawings on site.
|
Sprinkler Plan Check | 9/19/2018 | | 9/19/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/19/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2018 | | DONE |
Tim Frost
|
|
|
|
INSP-Sprinkler Rough-in | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 2 canopies complete, approved for cover.
Tom Phone #: ###-####
|
Intake Approval | | | 6/11/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/11/2018 | | 6/11/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/11/2018 | | 6/11/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/11/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/11/2018 | | DONE |
|
|
|
all requirements met
|
Issue and Print Permit | | | 6/11/2018 | | DONE |
|
|
|
|
Application received | | | 6/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 8 2018 7:40AM
|