Permit Information
Permit NumberFIR18-00484
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 960 S BROADWAY AVE Unit: 415
Project NameColes Reinstein TI
Customer Number 
ePlanReviewYes
Description
[Coles Reinstein TI] - Quick Permit
Suite 415, Add 2 SSP and relocate 2 SSP for revised wall ceiling layout

[BLD18-01694]
Permit is to combine and existing 2,373 sq. ft. business space with the adjacent 779 sq. ft. tenant space to create a new tenant space that is 3,152 sq. ft. within the 4th floor of the existing building. This permit is approved contingent upon adhering to the approved plans on file. Work includes: removal of select interior nonbearing walls, removal of select door/door frames and relocate, removal of select acoustic suspended ceiling, remove and relocate select millwork, construction of interior non-bearing walls to create an open office and a file room, select wall infill, select new suspended acoustic ceiling, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/6/20188/6/20188/6/2018PPASS
DetailsTroy Cobbley
Permit finaled


Bryan Phone #: ###-####
INSP-Sprinkler Rough-in7/25/20187/25/20187/25/2018PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
Issue and Print Permit  6/20/2018 DONE
(F) Reprint permit  6/20/2018 DONE
Sprinkler Plan Check6/19/2018 6/19/2018 PASS
DetailsTim Frost
Intake Approval  6/19/2018 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/19/2018 DONE
Permit Ready to Issue  6/19/2018 DONE
Intake Approval  6/18/2018 PASS
Plan assigned to (Tim)6/18/2018 6/18/2018 DONE
DetailsTim Frost
Sprinkler Plan Check6/18/2018 6/18/2018 FAIL
DetailsTim Frost
Miscellaneous action  6/18/2018 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
1st review completed  6/18/2018 FAIL
DetailsTim Frost
Application received  6/15/2018 DONE
Application submitted via PDS Online on Jun 15 2018 11:59AM