INSP-Final Inspection | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | FAIL |
Jim Page
|
|
|
Flow switch did not activate on water flow, paddle for water flow has something resticting full travel. Provide calculation sticker at riser.
Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Jim Page
|
|
|
Tenting inspectin complete, all plastic sheeting was in place at time of inspection, all overhead fire sprinkler piping approved for cover.
Tenting inspection, call Anthony if there are any concerns. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping located between conditioned spaces approved for cover, piping located in unconditioned spaces cannot be covered until a tenting inspection is performed.
|
INSP-Sprinkler Rough-in/Hydro | 8/6/2018 | 8/7/2018 | 8/7/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
Call Anthony to coordinate Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | CANC |
Jim Page
|
|
|
Inspection request will be rescheuled per conversation with point of contact.
Call Anthony to schedule, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Issue and Print Permit | | | 7/5/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/27/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/27/2018 | | 6/27/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 6/27/2018 | | 6/27/2018 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/27/2018 | | DONE |
|
|
|
all requirements met
|
Intake Approval | | | 6/18/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/18/2018 | | 6/18/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/18/2018 | | 6/18/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 6/18/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/18/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 6/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 15 2018 4:45PM
|