INSP-Final Inspection | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Please give Rick a call. Phone #: ###-#### Inspection requested via web by Mick Woodburn
|
INSP-Sprinkler Rough-in | 6/25/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
Jim Page
|
|
|
Wrong inspection request was scheduled on 22JUNE2018, inspection should have been a rough in inspection and not a final, permit status has been corrected, notes for rough in inspection are as followed: Rough to cover inspection overhead fire sprinkler piping in area of work complete, approved for cover. Reliable fusible link heads with the 401 escutcheons will need to be changed to quick response heads before final inspection, head change will be verified at final inspection.
|
CHANGE STATUS TO (ISS) | | | 6/25/2018 | | DONE |
Christina Prado
|
|
|
|
INSP-Final Inspection | 6/22/2018 | 6/22/2018 | 6/22/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection overhead fire sprinkler piping in area of work complete, approved for cover. Reliable fusible link heads with the 401 escutcheons will need to be changed to quick response heads before final inspection, head change will be verified at final inspection.
Rick- please call 30 mins ahead Phone #: ###-####
|
Plan resubmittals received | | | 6/20/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 6/20/2018 | | 6/20/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/20/2018 | | 6/20/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/20/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/20/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/19/2018 | | 6/19/2018 | | FAIL |
Tim Frost
|
|
|
|
Intake Approval | | | 6/19/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/19/2018 | | 6/19/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/19/2018 | | 6/19/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 6/19/2018 | | FAIL |
Tim Frost
|
|
|
|
Intake Approval | | | 6/18/2018 | | FAIL |
|
|
|
Did not provide a checklist.
|
Plan assigned to (Tim) | 6/18/2018 | | 6/18/2018 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 15 2018 5:21PM
|