INSP-Final Inspection | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Call Anthony to coordinate, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Jim Page
|
|
|
Tenting inspection complete, overhead fire sprinkler piping approved for cover.
Tenting inspection, ready any time. Let Anthony know if there are any issues. Thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, piping lpocated between condioned spaces approved for cover, piping in the attic space will need a tenting inspection perfromed before cover will be approved.
|
INSP-Sprinkler Rough-in/Hydro | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss pbserved at riser provided gauge.
Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Issue and Print Permit | | | 7/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/21/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/21/2018 | | 6/21/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/21/2018 | | 6/21/2018 | | DONE |
Tim Frost
|
|
|
|
1st review completed | | | 6/21/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/21/2018 | | DONE |
|
|
|
|
Application received | | | 6/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 19 2018 11:21AM
|