INSP-Final Inspection | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Please call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | FAIL |
Jim Page
|
|
|
Irrigation timer is not hooked to flow switch, no zone wires for irigation are installed so irrigation shutdown cannot be verified. Need to verify irrigation shutdown before permit can be finaled.
Please call Anthony before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Jim Page
|
|
|
Tenting inspection complete, overhead fire sprinkler piping approved for cover.
Tenting Inspection. Call Anthony if there are any issues. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Jim Page
|
|
|
Rough-in and hydro passed except one sprinkler head near furnace. Tenting inspection still needed. RJ
|
Permit Ready to Issue | | | 7/5/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/5/2018 | | DONE |
|
|
|
|
Application received | | | 6/25/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 25 2018 9:48AM
|
Intake Approval | | | 6/25/2018 | | PASS |
|
|
|
|
Sprinkler Plan Check | 6/25/2018 | | 6/25/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 6/25/2018 | | 6/25/2018 | | DONE |
Tim Frost
|
|
|
|
1st review completed | | | 6/25/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/25/2018 | | DONE |
|
|
|
|