INSP-Final Inspection | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Plan assigned to (Lee) | 10/29/2019 | | 10/30/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 10/30/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 10/30/2019 | | 10/30/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/30/2019 | | DONE |
|
|
|
As built - No fee.
|
CHANGE STATUS TO (ISS) | | | 10/30/2019 | | DONE |
|
|
|
2nd plan mod as built no fee per Lee
|
INSP-Final Inspection | 10/28/2019 | 10/29/2019 | 10/29/2019 | P | FAIL |
Troy Cobbley
|
|
|
Changes verified. Plan mods are needed showing the missing detector at first floor elevator lobby and the three NAC panels that are paired with the three other NAC panels. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Plan resubmittals received | | | 10/29/2019 | | DONE |
|
|
|
Morgan with Protex asked for the eplan work flow to be opened for as builts.
|
Plan assigned to (Lee) | 10/25/2019 | | 10/28/2019 | | DONE |
Lee G Meredith
|
|
|
Plan modification to change notification power supplies to resolve syncronization issues.
|
1st review completed | | | 10/28/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/28/2019 | | 10/28/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/28/2019 | | DONE |
|
|
|
Plan mod passed. Fee is $65.00 for one hour minimum.
|
Permit Ready to Issue | | | 10/28/2019 | | DONE |
|
|
|
DO NOT ISSUE plan mod
|
CHANGE STATUS TO (ISS) | | | 10/28/2019 | | DONE |
|
|
|
PLAN MOD
|
INSP-Final Inspection | 10/24/2019 | 10/25/2019 | 10/25/2019 | P | CANC |
Jim Page
|
|
|
Contact is Dirk. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|
Plan resubmittals received | | | 10/25/2019 | | DONE |
|
|
|
Morgan from Protex called to start an as built workflow
|
INSP-Final Inspection | 10/24/2019 | 10/25/2019 | 10/24/2019 | A | CANC |
Troy Cobbley
|
|
|
Contact is Dirk. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|
Plan assigned to (Lee) | 10/16/2019 | | 10/23/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 10/23/2019 | | PASS |
|
|
|
|
1st review completed | | | 10/23/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/23/2019 | | 10/23/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/23/2019 | | DONE |
|
|
|
As built - No fee
|
Permit Ready to Issue | | | 10/23/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/23/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/16/2019 | | DONE |
|
|
|
as built as per morgan with protex
|
INSP-Alarm Testing | 10/9/2019 | 10/10/2019 | 10/10/2019 | P | DONE |
Troy Cobbley
|
|
|
Tested the remaining smoke detectors and elevator recall. Per Lee the volume of the horns has been verified by a third party and is ok. Items need prior to a final sign off are the sync issue with the horns and the previously noted changes need to be applied. Plan mods are needed showing all of the changes.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Alarm Testing | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | DONE |
Troy Cobbley
|
|
|
Todays inspection we tested the smoke detectors in the first floor central area and the north wing. All tested ok. We set off the notification for the entire building and I noted that the visual devices have two patterns which is ok but the audible devices do not sync which is not ok as per NFPA 72. Also the smoke detectors are reporting correctly. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Plan assigned to (Lee) | 10/7/2019 | | 10/8/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 10/8/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/8/2019 | | 10/8/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/8/2019 | | DONE |
|
|
|
As built - No fee
|
Permit Ready to Issue | | | 10/8/2019 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 10/8/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/7/2019 | | DONE |
|
|
|
start a as built workflow per Morgan at Protex
|
INSP-Alarm Testing | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | FAIL |
Troy Cobbley
|
|
|
The smoke detectors are not reporting to the facp. Inspection stopped. The receiver troubles have been cleared.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Alarm Testing | 10/1/2019 | 10/2/2019 | 10/2/2019 | P | DONE |
Troy Cobbley
|
|
|
Today we finished the building walk through for the notification appliances. See the city approved plans for locations of deficiencies. Approx. 30 items. The fire alarm panel currently has dial out issues and does not appear to be reporting signals. Plans need to be resubmitted showing the candella changes and that many of the smoke detectors have not been installed. No smoke detectors were tested due to the communication troubles on the fire alarm panel.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | FAIL |
Troy Cobbley
|
|
|
For todays inspection I was able to check spaqcing of the south wing and center section first floor. Several devices are overspaced and many more had the candellas set incorrectly. Plans do not match the install such as horns shown but horn/strobes installed (the horn/strobes are required) Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Plan assigned to (Lee) | 9/25/2019 | | 9/26/2019 | | DONE |
Lee G Meredith
|
|
|
As BUILT
|
1st review completed | | | 9/26/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 9/26/2019 | | 9/26/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/26/2019 | | DONE |
|
|
|
As built - No Fee.
|
Permit Ready to Issue | | | 9/26/2019 | | DONE |
|
|
|
as built
|
CHANGE STATUS TO (ISS) | | | 9/26/2019 | | DONE |
|
|
|
as built
|
Plan Modification Accepted | | | 9/25/2019 | | DONE |
|
|
|
as built
|
INSP-Final Inspection | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | FAIL |
Troy Cobbley
|
|
|
Audibility levels tested. Most areas exceeded the maximum allowable volume of 110 dB and peaked between 112 and 116. All areas need to be reduced to below 110 dB. jonathan Phone #: ###-####.
|
INSP-Alarm Testing | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | DONE |
Troy Cobbley
|
|
|
Todays inspection we verified phone lines, panel, duct detector/hvac unit shutdown, flow switches and tamper switches. Plan modifications are needed showing all of the changes. Strobes are over spaced and need to be relocated or the candella adjusted. Smoke detectors are too close to diffusers. Strobes are missing in on location on the second floor as marked on the plans. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Conference | 2/28/2019 | 3/4/2019 | 3/4/2019 | A | DONE |
Troy Cobbley
|
|
|
I went over smoke detector spacing with the electrical and fire alarm contractor. I deferred elevator recall requirement to state inspector.
Contact Morgan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Alarm Plan Check | 2/11/2019 | | 2/11/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/11/2019 | | DONE |
|
|
|
Passed with review comments and drawing notation.
|
Permit Ready to Issue | | | 2/11/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 2/11/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/7/2019 | | DONE |
|
|
|
Most changes do not appear to have been made. Emailed Morgan to verify correct drawings were uploaded.
|
Alarm Plan Check | 1/24/2019 | | 1/24/2019 | | FAIL |
Lee G Meredith
|
|
|
Numerous errors on floor plans for detection and notification. Returned to Morgan for corrections.
|
Plan resubmittals received | | | 1/23/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/19/2018 | | DONE |
|
|
|
|
Alarm Plan Check | 11/19/2018 | | 11/19/2018 | | FAIL |
Lee G Meredith
|
|
|
Detector spacing does not meet the requirements of NFPA 72. Some notification is not adequate.
|
Plan resubmittals received | | | 11/15/2018 | | DONE |
|
|
|
Returned to Morgan. Replacement drawings did not have proper file names for corrected drawings.
|
Miscellaneous action | | | 7/26/2018 | | DONE |
|
|
|
Notified Morgan that visible and audible notification is inadequate throughout and will be returned for corrections. Also noted that detector spacing has not been reviewed at this time but that it will be required to meet 900 sq. ft. spacing in all required areas. Design is being returned for corrections.
|
Alarm Plan Check | 7/25/2018 | | 7/26/2018 | | FAIL |
Lee G Meredith
|
|
|
|
Plan resubmittals received | | | 7/25/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 7/5/2018 | | 7/6/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/6/2018 | | FAIL |
|
|
|
Candela not shown on floor plan. Riser indicates 15cd candela for all devices, regardless of room size. Returned for correction - compliance with NFPA 72 18.5.5.4.1.
|
Application received | | | 6/25/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 25 2018 12:22PM
|