Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR18-00538
StatusFinaled
Name LARSON FIRE PROTECTION LLC
Site Address 707 W FORT ST
Project NameLutheran Church Underground
Customer Number 
ePlanReviewYes
Description
[Lutheran Church - Udg Only] - Quick Permit
New underground supply for the Lutheran Church.

[BLD18-00887]
Permit for a tenant improvement to an existing church. Work to include: interior upgrade with HVAC system and related structural work; new doors and hardware for code compliance; accessible restrooms in the basement; interior non-bearing partitions; kitchen cabinets and equipment; sanctuary ceiling; lighting; new finishes in compliance with Ch. 8 of the 2015 IBC. An upgrade agreement is in place to address fire separation issues on the east side of the building. This building will be fully sprinklered with an NFPA 13 system installed throughout the building for area increase as Type VB construction. The Fire Sprinkler and Fire Alarm systems WILL REQUIRE SEPARATE PERMITS and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/7/20193/7/20193/7/2019PPASS
DetailsJim Page
Final inspection for underground supply completed on 01MAR2019
FIR-Aging Inspection3/1/20193/1/20193/1/2019PPASS
DetailsJim Page
Final inspection for underground supply complete.

can you final this yet?
INSP-Sprinkler Rough-in10/11/201810/11/201810/11/2018PPASS
DetailsJim Page
Rough to cover inspection for undergorund supply complete.
INSP-Supply line flush10/10/201810/11/201810/11/2018ADONE
DetailsJim Page
Underground main line flush complete.

undgeround-Ron Phone #: ###-####
INSP-Sprinkler Rough-in10/9/201810/10/201810/10/2018PFAIL
DetailsJim Page
Post indicator not in place at time of inspection.

Ron-underground Phone #: ###-####
Issue and Print Permit  7/16/2018 DONE
(F) Reprint permit  7/16/2018 DONE
Intake Approval  7/6/2018 PASS
Sprinkler Plan Check7/6/2018 7/6/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)7/6/2018 7/6/2018 DONE
DetailsTim Frost
1st review completed  7/6/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  7/6/2018 DONE
DetailsTim Frost
Permit Ready to Issue  7/6/2018 DONE
Application received  7/3/2018 DONE
Application submitted via PDS Online on Jul 3 2018 5:04PM