INSP-Final Inspection | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Jim Page
|
|
|
Final inspection for underground supply complete.
Gerardo Arce is the contact. This inspection has already been done, reach out to the contact for more information. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed for undergorund supply, no pressure loss observed.
Gabe Garduno is the contact for this underground hydro inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush witnessed.
Gabe Garduno is the contact. This inspection is for a flush and hydro. Thank you for all that you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 1/24/2019 | 1/29/2019 | 1/29/2019 | A | FAIL |
Jim Page
|
|
|
Point of contact could not be reached.
Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 11/8/2018 | 11/13/2018 | 11/13/2018 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2018 | 11/13/2018 | 11/13/2018 | P | CANC |
Troy Cobbley
|
|
|
Problem with the hydro pump.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for undergorund supply, stub up and approximately 12 feet of pipie approved for cover, remaining underground to be inspected at a later date.
Underground rough in Phone #: ###-#### Inspection requested via web by Stan Beus
|
Intake Approval | | | 7/10/2018 | | PASS |
|
|
|
|
Sprinkler Plan Check | 7/10/2018 | | 7/10/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/10/2018 | | 7/10/2018 | | DONE |
Tim Frost
|
|
|
|
1st review completed | | | 7/10/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/10/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/10/2018 | | DONE |
|
|
|
|
Application received | | | 7/9/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2018 5:52PM
|