INSP-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
INSP-Final Inspection | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | CANC |
Jim Page
|
|
|
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### >> Inspection requested via web by david davis Inspection cancelled from web by: david davis
|
INSP-Final Inspection | 7/31/2018 | 8/1/2018 | 7/31/2018 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by david davis Inspection cancelled from web by: david davis
|
Plan assigned to (Lee) | 7/19/2018 | | 7/19/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/19/2018 | | PASS |
|
|
|
|
Alarm Plan Check | 7/19/2018 | | 7/19/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/19/2018 | | DONE |
|
|
|
On site plan review approved. Permit desk notified.
|
Permit Ready to Issue | | | 7/19/2018 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/19/2018 | | DONE |
|
|
|
|
Application received | | | 7/13/2018 | | DONE |
Lee G Meredith
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 7/13/2018 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|